2/24/2007

B & A

Which wouldn't get me as many hits as "T & A" but that's just not gonna happen...I would have to rename my blog to PornBugg Press....


Anyway...
BEFORE (from the door)

AFTER (from the door)

The before doesn't display all of it's true ugly-iness. I was a new home owner and I didn't want it to look bad and I forgot to take pictures the day the demolition started....so I will tell you all the horrible details. Had a 70's gold toilet and that lovely toilet had a wooden toilet seat with brass hardware that did the green tarnish/corrosion thing everywhere. The vanity was 32" wide and the lip of the sink was actually over the toilet tank lid. Very squished space!!! The medicine cabinet was okay, but small. The shower walls had been put in incorrectly and a the caulking job done on it Alec could of done better. Shower curtain...I'm not real fond of those. The bathtub had no finish left and the people before had put those icky flower non-slip stickers on it and when they pulled them up it had warped the bathtub. I didn't think the bathtub faucet leaked...but when they took the old shower walls down...there was water damage and there was water damage on the baseboard area because it hadn't been sealed. As you saw in previous posts...the plumbing was horrible. The flooring that was in there was some very dark gray stick on tile that was coming up.

24" Sink and the vanity, medicine cabinet and bathroom cabinet all match!!! White Toilet!!!! (very important when you have boys...trust me :) )

View if you were about to wash your hands. I forgot to replace the light bulb before I took the picture.

View from the shower. New fancy stainless trashcan so the teen will hopefully not be such a pig!!

As the contractors left they told me not to go in there till Monday...Like that was gonna happen. I did stay out of it till today. I had to take the boys to a movie last night to keep me out of it....but I kinda minded. And......I got to take the first bath in the bathtub. Then Alec had his turn 3 times!!! I had to keep draining the cold water and refilling it with warm water. I wouldn't let him take a bath in the other tub because it was so gross...he really missed his baths. He didn't fight the shower, but he probably will now!!

I had read somewhere on the Internet that the average cost of a bathroom remodel in 2002 was $9,600.00. My budget was $7,500.00 and with the help of cool contractors, we came in under budget. Even with all the unplanned plumbing replacement and water damage/termite damage replacement!!! And I got TILE!! I didn't think I would be able to afford it until they told me how much it would cost to put in linoleum. Tile was actually CHEAPER!!!!

I also made spring break hotel reservations at Circus Circus in Las Vegas--that's right.....one mom, 2 little boys and 3 teenagers (yes I am insane) are gonna take on the City of Sin!!!

How was your week???

Labels: , ,

3 Comments:

Blogger MommaMonkey said...

Wow. What a transformation!!! It is beautiful!!! I love the tile work! Your contractors did a fab job!!!! Enjoy those showers and baths!

2/24/2007 7:16 PM  
Blogger Tracey said...

Golly, that bathroom looks terrific! Good job =)

2/25/2007 7:45 PM  
Anonymous Anonymous said...

Whooooaaa...looks great Beth!!

Vegas huh? Don't forget, Trish and I will be there in May so plan it around that time...

Capish?

2/26/2007 9:18 AM  

Post a Comment

<< Home